Hiren Patel Architects + Construction

We build
what we draw.

Design and build, under one roof. From the first line on paper to the last key in your hand.

15+ turnkey homes handed over2 on site now

See how we build
A room on site: glass to the city, the marble floor just laid, cables still across it.
A room handed over: glass to the garden at dusk, an armchair and a rug on polished stone.
Scroll

01 · One roof

One name on the drawing and on the door.

Hiren Patel Architects draws your home. HPA Construction builds it. One team carries it from the first line to the last key, so nothing is lost between the drawing and the site.

  • 3,000+Projects designed by Hiren Patel Architects
  • 15+Turnkey homes handed over
  • 2Homes on site now
On site, the drawing pinned to a raw concrete wall and checked by hand.
The drawing, on site
A site team in helmets, gathered in front of a finished stone house.
One team, one name

02 · The build

From the ground up.

Real photographs from our sites, stage by stage. Nothing here is a render.

Earthwork on one of our sites: an excavator loads a tipper truck.
The concrete frame of a house going up, with a water tank cast beside it.
Timber arriving on site, unloaded and stacked by hand.
A marble floor being polished on site, light through tall windows.
A home handed over: a timber room under clouds of light, the dining table beyond.
A report every 15 days

01 · Ground

The ground.

We are on the land from the first day.

02 · Frame

The frame.

The structure rises exactly as it is drawn.

03 · Material

The material.

Bought at the right rate, every bill shown to you.

04 · Finish

The finish.

Stone, timber and light, checked against the drawing.

05 · Keys

The keys.

A home, handed over. Built to last.

03 · The promise

Our promise, in writing.

15%

One fixed margin. It never moves.

85% goes into your home, every bill shown

15% is our margin, fixed

  • Open book

    Every bill and every rate, yours to see at any time.

  • Every 15 days

    A full report of your site: photographs, progress and money.

  • Per day

    A penalty for every day we are late, written into the contract.

04 · Handed over

What we build stays built.

15+ turnkey homes, each drawn and built by the same house. Two more are on site now.

Home 01 · Turnkey · Handed over

  • A double-height living room: tall curtains to the garden, a long sofa, a timber shelf.01
  • An entrance in deep blue, a lit sculpture and a timber door.02
  • A gallery passage: paintings, a blue rug, a timber ceiling.03
  • A bedroom with a timber wall, a glowing pendant and a red rug.04
  • A window wall at dusk, a sculpture on a low cabinet.05
  • A kitchen island in black stone, a bowl of fruit.06
  • A long view through the house: stone, timber, glass and a moon of light.07
  • A bedroom with a white canopy, timber behind the bed.08

05 · Begin

Begin with a conversation.

  1. 01

    The drawings

    Your home, drawn with you by Hiren Patel Architects.

  2. 02

    The cost

    Estimated line by line, before work begins.

  3. 03

    The build

    One team on site. A report every 15 days.

  4. 04

    The keys

    Handed over, with the books open.

WhatsApp us karan@hpad.co.in